Another milestone in the USBRL Project! Track laying work begins on Chenab Bridge
The track laying work commenced on the Chenab railway bridge, located 359 metres above the riverbed, in Reasi district of Ja…
The track laying work commenced on the Chenab railway bridge, located 359 metres above the riverbed, in Reasi district of Ja…
‘Cracks in residential structures in Doda set alarm bells ringing’ After mass migration from Uttrakhand’s Joshimath due to i…
Steps aimed to generate employment, showcase local products: CAM Northern Railways In a bid to showcase local products and c…
Project cost close to Rs 11000 Cr; formalities finalised, waiting for GoI’s approval: MRTC Official The much awaited J&K…
Bridge comprises 785 meters long steel arch spread over river; Bridge designed for blast load in consultation with DRDO; Con…
The railways operations remained normal and not a single Jammu Kashmir bound train was affected due to the collapse of a po…
‘Katra-Banihal section to have 7 railway stations, Project will be operational in 2023’ The 111-kilomter-long Katra-Banihal…